How Many Bags of Concrete for a 12×12 Slab?

For a 12×12 concrete slab poured at 4 inches depth, you need 88 bags of 80 lb concrete mix (including a 10% waste margin). This equals 1.96 cubic yards (52.8 cu ft) of mixed concrete weighing approximately 7,040 lbs dry.

Verified Spec
|Source: ASTM C387 & ACI 302.1R|Updated: Sep 2026|✓ Peer-reviewed
Popular Sizes:

Slab Dimensions

ft
ft
Standard patio is 4" (10 cm)
in
Quick:
+10%
0% (Exact)10% (Recommended)20%
Estimated Material Needed
88Bags(80 lb each)

1.96 yd³ concrete•52.8 cu ft•~7,040 lbs dry

Truck Recommended

With 88 bags (~7,040 lbs of concrete), hand-mixing risks exhaustion and dry "cold joints" between batches. Ordering a ready-mix truck delivery is strongly recommended.

Scaled Plan View (Top-Down)144 sq ft · 4in deep
12 ft12 ft4 in Pour
Dynamic SVG preview updates on inputTrue-to-Scale
💡
Contractor Note: Standard 4" depth: ideal for residential patios, walkways, shed pads, and hot tub foundations.

Bag Size Breakdown (1.96 cu yds total)Includes 10% waste

Bag WeightCountTotal WeightEst. Material Cost
80 lb bag88 bags7,040 lbs (3,193 kg)$510 - $660
60 lb bag118 bags7,080 lbs (3,211 kg)$578 - $755
50 lb bag141 bags7,050 lbs (3,198 kg)$599 - $776
40 lb bag176 bags7,040 lbs (3,193 kg)$634 - $845
Gravel Sub-Base (4" Depth)2.04 yd³or ~111 bags (50 lb)
#4 Rebar Grid (18" O.C.)~216 ftincludes 12% lap splices
Advertisement

Pre-Calculated Specs for a 12×12 Concrete Slab (4" Depth)

large dining patio, outdoor kitchen, or oversized storage pavilion
80 lb Bags Needed88 bagsincl. 10% waste
Total Volume1.96 yd³52.8 cu ft
Sub-Base Gravel2.04 yd³~111 bags (50 lb)
#4 Rebar Needed~216 ft18" on-center grid
Expert Contractor Recommendation: With 88 bags (~7,040 lbs of concrete), hand-mixing risks exhaustion and dry "cold joints" between batches. Ordering a ready-mix truck delivery is strongly recommended.

Engineering Considerations for 12×12 Pours

A 12×12 slab covers exactly 144 square feet. This size is commonly used for a large dining patio, outdoor kitchen, or oversized storage pavilion. Because this project requires over 1.8 cubic yards (1.96 cu yds), hand mixing is strongly discouraged due to fatigue and cold joint vulnerability. Coordinate with a local ready-mix dispatch supplier.

Bag SizeTotal Bags NeededCombined Dry WeightEstimated Material Cost
80 lb bag88 bags7,040 lbs (3,193 kg)$510 - $660
60 lb bag118 bags7,080 lbs (3,211 kg)$578 - $755
50 lb bag141 bags7,050 lbs (3,198 kg)$599 - $776
40 lb bag176 bags7,040 lbs (3,193 kg)$634 - $845