Concrete guide

Bagged Concrete vs. Ready-Mix Truck: Where the Break-Even Point Is

When mixing 80 lb bags yourself still makes sense, when a ready-mix truck is cheaper and safer, and how to estimate both for a patio or shed pad.

By Kadir C. · Published October 24, 2026 · 7 min read

For a small pour, the choice between mixing bags yourself and ordering a ready-mix truck looks like a price question. In practice it is mostly a question of time: concrete starts to stiffen within an hour or two, and the whole slab has to be placed and finished as one piece. This guide shows how to estimate both options, where the cost lines usually cross, and the practical limits that often decide the matter before price does.

1. Start with the volume

Every estimate begins with cubic feet: length (ft) × width (ft) × thickness (ft). Thickness is usually given in inches, so divide by 12. A 4-inch slab is 0.333 ft thick; a 5-inch slab is 0.417 ft.

Divide cubic feet by 27 to get cubic yards, the unit ready-mix suppliers sell by.

SlabThicknessCubic feetCubic yards
8 × 8 ft4 in21.30.79
10 × 10 ft4 in33.31.23
12 × 12 ft4 in48.01.78
10 × 20 ft4 in66.72.47
20 × 20 ft5 in166.76.17

2. How many bags that is

The yield is printed on every bag of dry concrete mix. Typical figures for standard mixes are about 0.60 cubic feet for an 80 lb bag, 0.45 for a 60 lb bag, and 0.30 for a 40 lb bag. That works out to roughly 45 bags of 80 lb mix per cubic yard. Always check your own product's label, since high-strength and fast-setting mixes can differ.

Bags needed = cubic feet ÷ yield per bag, rounded up, then add about 10% for spillage, uneven ground, and the slab coming out slightly thicker than planned (it almost always does).

Worked example: a 10 × 10 ft patio, 4 inches thick

  • Volume: 10 × 10 × 0.333 = 33.3 cu ft = 1.23 cubic yards
  • 80 lb bags: 33.3 ÷ 0.60 = 55.6, so 56 bags; with 10% extra, about 62 bags
  • Weight to move: 62 × 80 lb ≈ 2.5 tons of dry mix, plus roughly 100 gallons of water
  • Ready-mix: about 1.25 to 1.5 cubic yards ordered (suppliers add a margin too)

3. Comparing cost

Prices vary a lot by region and season, so treat the following as a method, not a quote. Put in your own local numbers.

Bagged

Bag cost × number of bags, plus mixer rental if you are not hand-mixing, plus delivery if you cannot haul 2 or more tons yourself. A standard pickup truck's payload is often 1,500 to 2,000 lb, so the 10 × 10 patio above is two or three trips.

Ready-mix

Price per cubic yard × yards ordered, plus fees that matter a great deal on small orders:

  • Short-load fee. Many plants have a minimum order (often several cubic yards) and charge a flat fee for anything below it. On a 1 to 2 yard pour this fee can be larger than the concrete itself.
  • Delivery and waiting time. Trucks usually allow a fixed unloading time, then charge by the minute or hour.
  • Pump or buggy if the truck cannot reach the forms. Ready-mix trucks are heavy and can crack driveways or sink into lawns.

Some suppliers also offer "mix-on-site" trucks (volumetric mixers) that charge only for what you use, which can be the best value in the 1 to 3 yard range. Ask whether that is available near you.

4. Where the break-even usually falls

Because of minimums and short-load fees, ready-mix is rarely cheaper than bags for very small slabs. As the volume rises, the per-yard price of ready-mix wins and the fixed fees get spread out. Many DIYers find the crossover somewhere between 1 and 2 cubic yards, but the honest answer is: call one local plant and ask for the total price for your exact volume, delivered, then compare it with the bag total. That single phone call settles it.

5. The limits that decide it before price does

Labor and time

Mixing an 80 lb bag in a wheelbarrow takes a few minutes of hard work. Mixing 60 of them while someone else places and screeds the concrete is a long, exhausting day, and the first batches start to stiffen before the last ones go in. A small electric drum mixer helps a lot, but the volume per batch is still limited.

Cold joints

If one batch begins to set before the next is placed against it, the two do not bond fully. The result is a "cold joint," a weak line that can crack or let water in. Ready-mix arrives all at once, so the slab is placed as a single mass.

Consistency

Ready-mix is batched by weight at the plant, so strength and water content are consistent. Hand mixes vary from batch to batch, mostly through how much water is added. Extra water makes concrete easier to place but weaker and more prone to cracking.

A practical rule of thumb

  • Under about 1 cubic yard (roughly 45 bags of 80 lb mix): bags are usually the sensible choice, ideally with a rented mixer and at least two people.
  • About 1 to 2 cubic yards: get a delivered ready-mix or mix-on-site quote and compare. Either can be right.
  • Above about 2 cubic yards, or anything that must be one continuous slab such as a driveway or garage floor: plan on ready-mix, and line up enough helpers to place and finish it before it sets.

Driveways, garage floors, and anything structural often need a permit and may have local thickness, reinforcement, and base requirements. Check with your building department before you order.

This guide is general information for typical residential projects, not professional engineering or legal advice. Product specifications and local codes vary; check your product label and your local building department. Found an error? Email contact@yardcraftcalc.com.